Search Constraints
Search Results
-
Dataset
Blomfield Street Phase 2 Mitigation, 11-12 Blomfield Street (Crossrail XTB12)
The archaeological work on site consisted of three separate interventions: an excavation in the area of the grout box, a targeted watching brief on the area of the Main box, and a general watching brief during ground reduction of the rest of the site. The excavation of the grout shaft...MOLA
excavation and stone